Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the check-email domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/austecau/public_html/wp-includes/functions.php on line 6121
HOTA Gallery | Austec Building Automation

HOTA Gallery

HOTA Gallery is a $60.5 million international-standard art gallery. The six-level facility is a purpose-built visual arts facility for exhibitions, education and engagement.

Scope:

Building & Energy Management System

Location:

Gold Coast, Queensland

Building Type:

Art Gallery

Client:

Dewpoint

Completion Date:

Late 2020

BMS I/O

Electrical Energy Meters

Thermal Energy Meters

Water Meters

About this Project

The scope of work consisted of the complete supply and installation of the Building & Energy Management System. Austec is utilising a complete, RELIABLE CONTROLS solution for the BMS and our in-house developed energy management platform for monitoring and analytics.

One of the critical requirements for the project is the gallery area’s require a AA rating of all temperature, humidity and CO2 monitoring devices (which is the most stringent level of monitoring in the ASHRAE Handbook on HVAC Applications).

The web-based graphics are connected to the site-wide BEMS for the CITY of GOLD COAST, which is also supplied and maintained by Austec for centralised access by CoGC personnel (see the City of Gold Coast project for further information).

Find out more about HOTA Gallery …

HOTA Gallery
HOTA Gallery